This image shows a portion of the extensive repairs being made to the tie-up and slide wall below Lock 2 on the Welland Canal. A section collapsed two years ago and repairs are still being done in the winter when the canal is closed. As we live about 200 metres from the site, we get to hear all this equipment (especially the red pile driver) quite loudly.
0 comments:
Post a Comment